Take length times width times thickness in feet, then divide by 27. That gives you the cubic yards of concrete to order. A 20 by 24 foot driveway poured 4 inches thick comes to about 5.9 yards, and you should order closer to 6.5.

That math takes a minute. What decides whether you make money is everything around it: base stone, forms, rebar, labor, truck charges, and a margin that survives surprises.

How do you calculate cubic yards of concrete?

Concrete is sold by the cubic yard, which is 27 cubic feet. Your measurements are in feet and inches, so the work is mostly unit conversion. Follow the same order every time.

  1. Measure length and width in feet. Break odd shapes into rectangles, triangles, and circles, then add the areas together.
  2. Convert thickness to feet by dividing inches by 12. Four inches becomes 0.333 feet.
  3. Multiply length, width, and thickness to get cubic feet.
  4. Divide cubic feet by 27 to get cubic yards.
  5. Add a waste factor of 5 to 10%.

Run the driveway example. 20 feet times 24 feet is 480 square feet. Multiply by 0.333 and you get 160 cubic feet. Divide by 27 and you get 5.93 yards. Add 10% and the order is 6.52 yards, so you call for 6.5 or 7 depending on how your supplier rounds.

Thickness is where small changes add up fast. Every extra inch on that same 480 square foot slab adds about 1.5 yards. Residential driveways are commonly poured 4 inches thick, while heavier loads such as delivery trucks or dumpsters usually call for 5 or 6 inches. Follow the plans or the engineer's spec when there is one.

Waste covers an uneven subgrade, bowed forms, and spillage. Stay near 5% on a smooth, well-graded base. Go to 10% or more on a rough grade or when you have hand-dug footings. Ordering short can cost more than ordering long, because a second truck may mean another delivery fee and a visible seam across the slab.

What else belongs in a concrete takeoff?

Concrete is only one line item. A takeoff, the list of every material and quantity the job needs, should include each of the items below before you price anything.

  • Base stone: A 4 inch base under the same 480 square feet works out to about 5.9 cubic yards of stone (480 square feet times 0.333 feet, divided by 27), before any allowance for compaction. Stone settles when you pack it down with a plate compactor or roller (compaction), so order extra. Ask your supplier for the yards to tons conversion on the stone they sell.
  • Forms: Measure the perimeter. For a rectangular slab, add up all four sides (2 times the length plus 2 times the width) to get the linear feet of form boards, plus stakes and bracing.
  • Reinforcement: Price rebar or wire mesh by the square foot of slab, and add overlap where sheets or bars meet. Follow the spacing in the spec.
  • Joints: Count the control joints you will tool or saw, plus expansion joint material where the slab meets a garage, walk, or foundation. A common rule of thumb is to space joints at roughly 2 to 3 times the slab thickness in feet, but check the spec.
  • Finishing supplies: Curing compound, sealer, release agent, and any color or fiber additives.

Write each quantity on the estimate with its unit and its source. When a supplier price changes or a client adds a patio, you can update one line instead of redoing the job. If you build these in a spreadsheet, our comparison of estimating software vs. spreadsheets shows where that approach starts to cost you time.

Which labor and job costs do most concrete estimates miss?

Material quantities are easy to check. Labor and site costs are where bids lose money. Start with your own numbers: crew size, hours on site, and hours for prep, pour, finishing, and cleanup. Your past jobs are a better guide than any published rate.

Then add the costs that never show up in a calculator:

  • Demolition and haul-off of old concrete, including dump fees.
  • A pump or extra wheelbarrow labor when the truck cannot reach the forms.
  • Supplier extras such as short load fees, fuel surcharges, and charges for time spent waiting on site. Truck capacity and minimum loads vary, so confirm your supplier's minimums and delivery rules.
  • Saw cutting, washout, and equipment rental.
  • Permits, travel time, and mobilization to a distant job site.
  • Extra base where soft spots show up once the old surface is out.

Access matters too. A pour that needs a pump and a tight alley is a different job than a driveway with a straight shot from the street. That stays true even when the yardage is the same. Note every access assumption on the estimate.

How do you price concrete for profit?

Add up your direct costs first: materials, labor, equipment, disposal, and fees. Then add margin. Margin and markup are not the same, and mixing them up quietly eats your profit.

Picture a job with $4,000 in direct costs. A 25% markup gives you a $5,000 price ($4,000 plus $1,000), but your margin is only 20%, because $1,000 is 20% of $5,000. To earn a true 25% margin, divide cost by 0.75 and price the job at about $5,333 ($4,000 divided by 0.75). That gap is about $333 on this one job.

Your margin also has to cover overhead like insurance, trucks, and office time. It should leave room for a contingency line for subgrade surprises. Per-square-foot rules of thumb vary by region, base condition, and access, so use them only as a sanity check. Our guide on what paving contractors charge per square foot explains the variables behind those numbers.

Get the supplier's concrete price in writing and note how long it holds. Then list your assumptions on the proposal: thickness, base depth, joint layout, and what is excluded, such as extra base for soft spots. Clients sign faster when the scope is clear, and you have something to point to if the site conditions change. A clean, professional layout helps too, and our roundup of contractor proposal software for paving companies covers what to look for.

One habit pays off quickly. After each pour, compare the yards you estimated with the yards the trucks delivered. If you keep running over, your waste factor or your grade measurements are off, and you can fix that before the next bid.

Check your last three pours, then price the next one in Paver

Pull the last three concrete jobs you bid and compare the yards you estimated with the yards you poured. Then check whether margin held after base, labor, and truck fees. Whatever line ran over is the one to tighten on your next estimate.

When the next driveway or slab comes up, start a Paver estimate. We built Paver to combine estimating and client-ready proposals in one flow. You enter your measurements and costs and leave with a clear proposal, without rebuilding the numbers in a second tool.